Web Link | Jobs | Contact us | Member | Site Map
ไทย | English
 
 
|
Home > Training Course
Training Course

Mould and Moulding
Plastic Injection Mould and Moulding (MOT)
Mould Polishing 43-MOT-61 19- 20 JAN 5,500
Hot Runner Mould Design 43-MOT-33 20- 21 FEB 6,000
Setting Up Injection Moulding Machine 43-MOT-52 23- 24 FEB 6,000
Plastic Injection Mould Maintenance 43-MOT-81 30- 31 JAN 6,000
Plastic Injection Moulding 43-MOT-51 16- 17 FEB 6,000
Plastic Mould Technology 43-MOT-01 14- 15 FEB 6,000
Plastic Injection Mould Design 43-MOT-31 23- 26 JAN 8,500
Plastic Injection Mould Design Using NX Mold Wizard 43-MOT-32 14- 17 FEB 8,900
Blow Mould Design Fundamental 43-MOT-21 06- 07 FEB 5,700
Plastic Injection Mould Drawing Using CAD 2D (AutoCAD) 43-MOT-12 07- 09 AUG 7,500
Cost Estimation of Plastic Injection Mould for Purchasing 43-MOT-71 22- 24 FEB 6,900
Plastic Injection Mould Fitting and Assembly Techniques 43-MOT-82 26- 27 JUN 5,500
CAE for Mould Design (CADMould, Moldex3D) 43-MOT-41 24- 27 APR 9,500
Analysis and Troubleshooting Plastic Injection Moulding 43-MOT-53 26- 27 JAN 6,000
Multi-Component Injection Mould Technology 43-MOT-34 17- 18 AUG 6,000
Interpretation of the Results from CAE Analysis for Improving Plastic Injection Mould and Moulding 43-MOT-42 06- 07 FEB 5,500
Plastic Injection Mould Drawing Using CAD 2D (CAD for NX) 43-MOT-13 25- 27 SEP 7,500
Metal Forming (TDT)
Stamping Die Making Planning and Control 42-TDT-71 06- 07 FEB 6,000
Analysis and Troubleshooting for Sheet Metal Forming 42-TDT-52 20- 21 FEB 5,500
Shaving & Trimming Die Improvement Techinique 42-TDT-24 20- 20 JAN 3,200
Progressive Die Design by NX Program 42-TDT-62 27- 02 FEB 8,900
Die Improvement 42-TDT-22 20- 21 FEB 5,500
Metal Stamping Die Maintenance 42-TDT-11 26- 27 JAN 6,000
Stamping Die Maintenance 42-TDT-21 14- 15 FEB 6,000
CAE for Sheet Metal Forming 42-TDT-41 21- 23 FEB 6,900
Stamping Die Drawing Using CAD 3D (NX) 42-TDT-63 21- 23 AUG 6,500
Stamping Die Design Elements Calculation and Die Manufacuring Process Determaination Level 1 42-TDT-72 21- 22 AUG 6,000
Stamping Die Drawing Using CAD 3D (NX) 42-TDT-64 04- 06 SEP 6,500
Reading, Interpretation & Production of Die Drawing 42-TDT-60 01- 02 FEB 5,500
Single Die Design 42-TDT-30 14- 16 FEB 6,900
Die Setting for Production 42-TDT-51 03- 04 APR 5,500
Drawing Die Technology 42-TDT-32 01- 03 FEB 6,900
Progressive Die Design 42-TDT-31 14- 17 MAR 9,500
Progressive Die Design by VISI Program 42-TDT-61 22- 25 MAY 8,900
Blanking & Piercing Die Improvemnet Technique 42-TDT-23 02- 03 MAR 5,500
Jig & Fixture
Checking Fixture 44-JIG-11 23- 24 FEB 5,200
Automation Jig & Fixture Design 44-JIG-31 25- 27 JAN 8,600
Jig & Fixture for Machining 44-JIG-01 19- 20 JAN 5,200
Diamensioning and Toleracing for Jig & Fixture 44-JIG-22 06- 06 FEB 2,500
Machining Jig & Fixture Design 44-JIG-02 30- 31 JAN 5,200
Control System Design for Pick and Place 44-JIG-52 25- 27 APR 8,600
Reading and Interpretation Jig & Fixture Drawing 44-JIG-21 19- 20 JAN 5,200
Pick and Place Machine Design 44-JIG-51 06- 08 FEB 8,600
Control System Design for Pick and Place 44-JIG-53 14- 16 FEB 8,600
CAD 3D SolidWork for Jig & Fixture 44-JIG-24 15- 17 MAR 8,600
Die Casting
Die Casting Technology 42-DCT-01 09- 10 FEB 5,500
Conventional Machining
Conventional Machining
Sharpening Technique for Basic Machine Cutting Tools 44-MEF-40 16- 17 FEB 4,200
Safety in The Use of Machinery 44-SEF-01 30- 30 JAN 2,200
Grinding Wheel Selection Technique 44-MEF-30 21- 21 APR 2,200
Machining Precision Part by Milling level 1 44-MEF-21 18- 20 JAN 9,500
Grinding Technique 70-MEF-53 17- 17 MAR 2,200
Turning Technique Level 2 44-MEF-12 25- 27 JAN 9,500
Cylindrical Grinding 44-MEF-32 25- 27 JAN 9,500
Turning Technique Level 1 44-MEF-11 23- 25 JAN 9,500
Tool & Cutter Grinding 44-MEF-41 22- 24 MAR 9,500
Machine Alignment with Basic Measuring Tool 44-CAL-01 06- 07 FEB 6,000
Surface Grinding Technique 44-MEF-31 06- 08 FEB 9,500
Turning Technique Level 1 44-MEF-13 01- 03 MAR 9,500
Milling Technique Level 1 70-MEF-52 30- 30 JAN 2,200
Form Grinding Technique 44-MEF-33 17- 18 JUL 5,500
Turning Technique 70-MEF-51 06- 06 MAR 2,200
CNC Machining
CNC Programming for Turning 41-CNC-51 30- 31 JAN 5,500
Cost Estimation of Machining Process 41-CNC-61 20- 20 JAN 2,900
CNC Programming for Milling 41-CNC-41 06- 07 FEB 5,500
CNC Turning Machine Control Level 1(Siemens Controller) 41-CNC-32 20- 23 MAR 11,500
EDM Machine and Wire EDM Machine Maintenance 41-EDM-21 06- 06 FEB 2,500
CNC Turning Machine Control Level 3 41-CNC-13 14- 16 FEB 10,500
Wire EDM Technique Level 1 41-EDM-11 14- 17 FEB 11,500
CNC Milling Machine Control Level 1 41-CNC-01 23- 26 JAN 11,500
Macro Programming for CNC Milling 41-CNC-42 14- 15 FEB 5,500
CNC Milling Machine Control Level 2 41-CNC-02 27- 02 FEB 11,500
Cutting Technology for CNC Machine 41-CNC-21 01- 02 FEB 5,200
CNC Turning Machine Control Level 2 41-CNC-12 20- 23 FEB 11,500
Improve the Effciency of Cutting Process 41-CNC-22 16- 16 FEB 2,900
CNC Milling Machine Control Level 1 (Siemens Controller) 41-CNC-31 20- 23 FEB 11,500
EDM Die Sinking Technique Level 1 41-EDM-01 23- 26 JAN 11,500
Macro Programming for CNC Turning 41-CNC-52 26- 27 OCT 5,500
CNC Milling 5 Axis Machine Control Level 1 41-CNC-03 24- 27 JUL 13,500
CNC Turning Machine Control Level 1 41-CNC-11 13- 16 MAR 11,500
CAD/CAM
CAD
Mechanical Part Modeling with NX 8.0 25-CAD-30 20- 23 FEB 8,500
3D Assembly with Autodesk Inventor 2017 25-CAD-41 06- 09 FEB 7,500
Surface Modeling with NX 8.0 25-CAD-31 17- 20 JUL 8,500
Drafting with AutoCAD 2017 25-CAD-15 23- 26 JAN 7,900
3D Modeling with SolidWorks 2014 25-CAD-50 23- 26 JAN 6,000
SolidWorks Advance Part Modeling 25-CAD-52 20- 22 FEB 7,000
CAM
CAM Technique for CNC Turning by Master CAM Program 41-CAM-32 23- 24 FEB 5,900
CAM Technique for 4-5 Axis Machining by HyperMill Program 41-CAM-12 20- 23 MAR 9,900
CAM Technique for 3 Axis Machining by Master CAM Program 41-CAM-21 25- 27 JAN 8,500
CAM Technique for Wire EDM by Master CAM Program 41-CAM-41 20- 21 FEB 5,900
CAM Technique for 3 Axis Machining by NX Program 41-CAM-01 20- 23 FEB 9,500
CAM Technique for CNC Turning by Master CAM Program 41-CAM-31 06- 07 FEB 5,900
CAM Technique for 3 Axis Machining by HyperMill Program 41-CAM-11 14- 17 FEB 9,500
Mechanical Engineering Drawing
GD&T According to ASME Y14.5-2009 25-DRA-20 14- 16 FEB 6,700
Mechanical Blue-Print Drawing Reading 25-DRA-10 07- 09 FEB 5,500
Advance GD&T According to ASME Y14.5-2009 25-DRA-C-21 25- 27 APR 6,900
Dimensioning and Tolerancing in Mechanical Drawing 25-DRA-12 23- 25 JAN 6,000
Predictive Maintenance
Predictive Maintenance
Fundamental of Vibration Analysis 63-VBA-10 16- 17 FEB 9,000
Application of Vibration Analysis 63-VBA-20 01- 03 MAR 15,000
นิวเมติก & ไฮดรอลิก
Pneumatics & Hydraulics
PLC (OMRON) Control Pneumatics 21-PNE-22 21- 23 FEB 9,500
Maintenance and Troubleshooting of Pneumatics & Electro-Pneumatics Systems 21-PNE-32 28- 30 MAR 9,500
Proportional Hydraulics Control Systems 21-HYD-24 20- 22 FEB 11,000
Mobile Hydraulic System 21-HYD-41 27- 02 FEB 10,500
Closed Loop Electro-Hydraulic Control Systems 21-HYD-28 24- 27 APR 13,000
Fundamentals of Hydraulic Systems 21-HYD-10 13- 16 MAR 10,000
Fundamental of Pneumatics Control System 21-PNE-10 01- 03 FEB 8,600
Electro-Hydraulic Control Systerms 21-HYD-21 30- 01 JAN 9,500
Advanced Hydraulic System 21-HYD-11 20- 23 FEB 12,000
Design & Sizeing of Pneumatic Components 21-PNE-52 24- 25 JAN 7,000
Maintenance and Troubleshooting of Hydraulic Systems 21-HYD-32 06- 07 FEB 8,000
Variable Hydraulic Pump 21-HYD-13 04- 05 APR 7,500
Electro-Pneumatics Control Systems 21-PNE-21 07- 09 FEB 8,600
Robot&Mecha
Robotics
DELTA, SCARA, CATESIAN ROBOT Design & Control (Mechanical) 22-ROB-70 23- 25 MAY 5,000
Robot (FANUC) Maintenance & Troubleshooting 22-ROB-31 30- 01 MAY 10,000
Robot (FANUC) Programming Advance Level 22-ROB-32 06- 08 JUN 10,000
Robot (MOTOMAN : Yaskawa) Maintenance & Troubleshooting (Mechanical Section) 22-ROB-41 20- 22 JUN 10,000
Robot (FANUC) Operate & Programming Basic Level 22-ROB-30 16- 18 MAY 10,000
Cartesien Robot Designe (X-Y-Z) for Industrial application 21-ROB-20 16- 18 MAY 10,500
Robot (OTC DAIHEN) Operate & Programming Basic Level 22-ROB-50 30- 01 MAY 10,000
Robot (MOTOMAN : Yasakawa) Programming Advance level 22-ROB-42 27- 29 JUN 10,000
ROBOT (MITSUBISHI) Operate & Programimg Basic Level 22-ROB-60 13- 15 JUN 9,000
Robot (MOTOMAN : Yaskawa) Operate & Programming Basic Level 22-ROB-40 13- 15 JUN 10,000
Mechatronics
Machine Vision System (Camera, Light Source & Software Interface) 22-MEC-31 21- 22 MAR 7,000
Implementation of Machinery Safety 21-MEC-51 15- 16 FEB 6,500
Design & Programming of Automated Guided Vehicles (AGVs) 21-MEC-41 21- 23 FEB 10,500
Design, commissioning and troubleshooting of automated manufacturing control system 21-MEC-10 20- 22 JUN 10,500
Robotics (Pick & Place) interface to Machine Vision Inspection 22-MEC-32 25- 27 JUL 9,000
วัสดุ/การวัดและตรวจสอบ/สอบเทียบ
Testing and Meterial
GD&T Inspection Technique with CMM 24-QAS-13 22- 24 FEB 6,500
Meterial Testing 24-MEU-21 02- 03 FEB 6,000
Corrosion and Its Control 24-MEU-31 15- 16 JUN 4,500
Inspection Technique with Venier Caliper and Micrometer 24-QAS-10 25- 27 JAN 4,500
Inspection with CMM Machine 24-QAS-12 15- 17 MAR 6,000
Heat Treatment 24-MEU-10 01- 03 MAR 6,000
Inspection Technique with Dial Gauge, Angle Gauge and Gauge Block 24-QAS-11 08- 10 FEB 5,500
Surface Hard Coating Selection and Specification 24-MEU-41 24- 24 MAR 2,500
Failure Analysis Techinique and Application 24-MEU-53 16- 17 FEB 7,000
Calibration
CNC Machine Calibration 24-QAS-20 09- 10 MAR 5,500
การเชื่ิอมและบัดกรี
Welding and Brazing
MIG Welding Procedure and Testing According to International Standard for Aluminum 24-WET-22 15- 17 FEB 7,500
MAG Welding Procedure and Testing According to International Standard 24-WET-21 01- 03 MAR 7,500
TIG Welding Procedure and Testing According to International Standard (for Stainless and Aluminum) 24-WET-31 08- 10 MAR 9,000
TIG Welding for Mould & Die Maintenance 24-WET-52 18- 20 JAN 8,000
ARC Welding Procedure and Testing According to International Standard Part 2 24-WET-12 01- 03 FEB 7,000
ARC Welding Procedure and Testing According to International Standard Part 1 24-WET-11 22- 24 MAR 6,500
PLC/SCADA&DCS/Commu
PLC
PLC (Siemens)-S7-1200 & TIA Portal Programmin Basic Level 22-PLC-70 27- 01 FEB 9,000
PLC (Control Logix 5000 & RS Logix 5000) Programming Basic Level 22-PLC-53 14- 16 FEB 11,000
PLC (Mitsubishi) & GX-Work 2 Programming Basic Level 22-PLC-40 30- 02 JAN 12,000
PLC - S7 Programming Intermediate Level 22-PLC-21 20- 23 FEB 12,000
PLC (SLC 500) & RS Logix500 Programming Basic Level 22-PLC-50 14- 16 FEB 11,000
PLC - S7 Programming Basic Level 22-PLC-20 30- 02 JAN 12,000
PLC (OMRON) & CX-Programmer Programming Advanced Level 22-PLC-62 13- 15 MAR 10,500
PLC (Mitsubishi) Programming Advanced Level 22-PLC-32 24- 27 APR 12,000
PLC (Control Logix 5000 & RS Logix) Progra,mming Advanced Level 22-PLC-54 27- 29 MAR 11,000
PLC-S7-200 Programming Advanced Level (Communication, Closeloop Control) 22-PLC-22 21- 23 MAR 11,000
PLC (OMRON) & CX-Programmer Programming Basic Level 22-PLC-60 15- 17 FEB 10,500
PLC-S7 Troubleshooting Basic Level 22-PLC-24 18- 20 APR 11,000
SCADA & DCS
WinCC Flexible for Touch screen (Siemens)l 22-PRO-32 13- 15 MAR 11,000
PCS7 Programming and WinCC for Process Control Basic Level 22-PRO-41 27- 30 MAR 15,000
Touch Screen (Proface) Design & Interface via PLC 22-PRO-60 23- 25 JAN 10,500
Touch Screen (GOT: Mitsubishi) Design & Interface via PLC (Mitsubishi) 22-PRO-61 23- 25 JAN 9,500
WinCC (SCADA) for Producttion Process 22-PRO-31 20- 22 FEB 10,500
Communication
CC-Link Communication Technology via PLC (Mitsubishi) 22-IIT-81 13- 15 MAR 9,000
Profi Net & Industrial Ethernet with PLC S7 22-IIT-51 22- 23 MAR 8,000
Profibus DP (Configuration & Troubleshooting) 22-IIT-61 05- 08 JUN 12,000
Industrial Network (LAN, Wireless, Industrial Filed) 22-IIT-52 15- 16 FEB 8,000
DeviceNet, ControlNet, EterNet IP via PLC (Control Logix 5000) 22-IIT-41 27- 28 FEB 8,000
Electrical Power/Motor&Drives
Electrical Power
Electrical Power Maintenance for Factory Basic Level 22-EEP-11 01- 02 MAR 7,000
Electrical Power Maintenance for Factory Advanced Level (High Voltage Substation, SW Gear, Power Transformer) 22-EEP-12 27- 28 MAR 7,500
Basic Electrical & Electronic in Machine 22-EEP-10 15- 16 FEB 7,000
Electrical Drawing (2D, 3D) With Solidworks Electrical 22-EEP-20 13- 15 MAR 8,000
Electrical Drawing with AutoCAD Electrical 22-EEP-30 06- 08 FEB 8,000
Electrical Diagram/Drawing Reading & Control Cabinet Wiring Standard 22-EEP-21 20- 23 FEB 11,000
Motor & Drives
Servo Motor & Drive (Mitsubishi) Control by PLC (Mitsubishi) 22-DRC-14 06- 08 MAR 11,000
Fundamentals of DC/AC Motors 22-DRC-10 13- 15 MAR 9,000
Positioning Control for Servo Motor with Posittion Module (Mitsubishi) 22-DRC-13 22- 24 FEB 11,000
Design of Magnetic Relay Circuit for Electric Motor Control 22-DRC-21 23- 25 JAN 9,000
Sinamic Servo Control (Siemens) 22-DRC-40 20- 22 FEB 11,000
Inverter Control for 3-Phase Induction Motors 22-DRC-32 30- 01 JAN 10,000
Maintenance of Electrical component & Drives system in Machine 22-DRC-34 03- 05 APR 11,000
Sensor Technology & Temperature Controller 22-DRC-22 15- 17 FEB 8,500
Digital & Micro Controller
Machine Techno
Machine Technology
CNC Machine Retrofit (Mechanical Section) 22-MAT-30 08- 09 MAY 8,000
CNC Machine Maintenance & Troubleshooting Basic Level 22-MAT-10 28- 30 MAR 11,000
Injection Molding Machine Maintenance (Servo Motor Type) 22-MAT-20 13- 14 JUL 8,000
CNC Machine Retrofit (Servo Motor & Drive) 22-MAT-31 20- 22 JUN 9,000
CNC Machine Maintenance & Troubleshooting Advance Level 22-MAT-12 25- 26 APR 8,000
Machine Design
Mechaniclal Part Design 21-MCD-11 13- 15 FEB 6,000
Machinery load Defining 21-MCD-01 23- 25 JAN 6,000
Lubricaition and Mechnical Part Surface Design 21-MCD-14 22- 24 MAY 6,000
Sizing and Selection Mechanical Standard Part 1 21-MCD-12 20- 22 MAR 6,000
On Request
PLC (On Request)
PLC (Mitsubishi) & GX-Developer Programming Basic Level 22-PLC-30 31- 31 DEC 12,000
Communication (On Request)
Process Instrumentation Basic Level 22-IIT-62 31- 31 DEC 7,500
Digital & Micro Controller (On Request)
SCADA & DCS (On Request)
PID Tuning Optimization for Process Control 22-PRO-42 31- 31 DEC 7,500
Welding and Brazing (On Request)
Brazing Procedure 24-WET-10 31- 31 DEC 2,500
MIG Weldingfor Cooper Brass and Aluminium 24-WET-53 31- 31 DEC 6,500
Maintenance Welding Technique with Cover Electrode 24-WET-51 31- 31 DEC 6,000
Mechatronics (On Request)
Robotics (On Request)
Pneumatics & Hydraulics (On Request)
Hydraulic Proportional Pressure Control Valve 21-HYD-26 31- 31 DEC 4,500
Optimization of Compressed Air Preparation System 21-PNE-42 31- 31 DEC 5,500
Hydraulic Accumulator 21-HYD-12 31- 31 DEC 3,500
Cartridge or Logic Valve in Hydraulic Systems 21-HYD-14 31- 31 DEC 5,500
Hydraulic Proportional Directional-Control Valve 21-HYD-25 31- 31 DEC 4,000
PLC (OMRON) Control-Hydraulic System 21-HYD-22 31- 31 DEC 10,500
PLC (OMRON) Network System,HMI (NB-Designer) and SCADA 21-PNE-23 30- 02 MAY 12,000
CNC Machining (On Request)
Wire EDM Technique Level 2 41-EDM-12 31- 31 DEC 11,500
EDM Die Sinking Technique Level 2 41-EDM-02 31- 31 DEC 11,500
CAM (On Request)
CAM Technique for 4-5 Axis Machining by NX Program 41-CAM-02 31- 31 DEC 9,900
CAD (On Request)
3D Assembly with Autodesk Inventor 2009 25-CAD-40 31- 31 DEC 7,200
AutoCAD Part 3 25-CAD-03 31- 31 DEC 7,500
AutoCAD Part 4 25-CAD-04 31- 31 DEC 7,500
AutoCAD Part 1 25-CAD-01 31- 31 DEC 7,500
AutoCAD Part 2 25-CAD-02 31- 31 DEC 7,500
Metal Forming (On Request)
Motor and Drives (On Request)
Sevo Motor & Drive (Yaskawa) Control by PLC (OMRON) 22-DRC-12 31- 31 DEC 10,000
Machine Technology (On Request)
CNC Machine Retrofit (CNC Controller Ladder) 22-MAT-32 31- 31 DEC 10,000
CNC Machine Retrofit (System Integrated & Commissioning) 22-MAT-33 31- 31 DEC 10,000
Mechanical Engineering Drawing (On Request)
Jig and Fixture (On Request)
Jig & Fixture Calibration 44-JIG-41 31- 31 DEC 5,500
Modern Manufacturing
Modern Manufacturing
Production Management by ERP 22-MOM-10 21- 23 FEB 9,000
Sensor & Data Acquistion with LabView to Support Smart Factory 22-MOM-30 16- 17 MAR 7,000
Visual Basic & Database Programming Interface to Barcode, QR Code Detector 22-MOM-21 14- 15 MAR 7,000
Database System for Production Manufacturing 22-MOM-20 07- 08 FEB 7,000
Logistics System RFID Interface to Database & Logistics System 22-MOM-11 07- 08 MAR 7,500
Operation Management
Operation Management
Virtualization Simulation of Automatic Production Process by Process Simulation Software 21-OPM-20 24- 26 JAN 9,000
To Optimized The Production Line Model for Productivity Improvement by Plant Simulation 21-OPM-10 14- 16 FEB 11,000
 
Course name
Branch
Start date -
  Course Seminar
 
 
 
     
  Registration Forgot password
  Username : *  
  Password : *
     
 
 
Magazine : UP TO DATE Jan - Jun 2017 : Issue 1
Publish : 12 JAN 2017

 
     
   
     
 

Warning: Unknown: write failed: No space left on device (28) in Unknown on line 0

Warning: Unknown: Failed to write session data (files). Please verify that the current setting of session.save_path is correct () in Unknown on line 0